Busy weekend is busy!
I got the new pump installed an plumbed. I filled the tank back up to leak test. I also finished building the controller box and hooked up all the electronics. I’m now testing the tank using the controller to run the chiller/heater and pumps.
I still have to mount all the float switches and do a lot of cable management, but it’s all working.
I also still need to figure out how I’m going to mount the controller box to the bottom of the stand.